Revamping

Description

Using its design and production know how, Omer has carried out projects to renovate railway coaches, both internally and with co-design. Starting from existing box mathematics, and then analysing the client’s technical specifications while taking current regulations into account, Omer boasts numerous revamping projects for the coaches of national trains. These projects involve the technical modernization of the products, adapting them to conform to safety regulations by fitting fire prevention systems in the coaches for example, and restyling various features with a more modern look.

Semipilot IR

  • Partition and longitudinal walls
  • Window panels
  • Panels below the windows and air channel casing
  • Luggage racks and lower luggage rack casing
  • Ceiling hangings
  • Ceiling covering
  • Complete furnishing of the entrance areas
  • Compartment sliding doors
  • Boarding step lining
  • Lowered area ceiling panels
  • Fire-proof walls for cabin and compartment sides
  • Cabin lining
  • Electricity cabinet lining

Local carriage with lowered floor

  • Window panels
  • Panels under the windows
  • Lining for static converter