Temporary Bridging Unit

Description
Specifications

The temporary bridging unit allows public, pedestrian and vehicular access. Conforms to the construction and use regulations such as cars, buses and lorries – up to 40 tonnes gross vehicle weight. the bridge is quick and hassle free to install, it doesn’t require a crane and installation time is around 15 mins. This is available for short- and long-term hire. Premier Rail also offer delivery and collection across the UK.

  • 6m span
  • Pedestrian / vehicular access
  • Bolted hand railing system
  • Install and remove with RRV/Telehandler
  • Installation time 15 mins