Principal Supply Points (PSP’s)

Description
Specifications

Baldwin and Francis design robust, high quality PSP’s which are renowned for their reliability and ease of installation. With over 200 installations throughout the UK rail network, Baldwin and Francis are a leading and trusted supplier. Baldwin and Francis also supply a full service offering from design and manufacturing to installation and maintenance services.

Suitable for: Diesel and Electrified Railway Lines.

Built to your specifications:
Our Principal Supply Points are highly customisable and can be tailored to suit your exact requirements. The main customisables are:-

  • Can be installed in existing or new brick built trackside buildings
  • SCADA monitoring and remote control facilities available
  • Baldwin and Francis relocatable custom container type trackside housings for mains/DNO and traction incomer switchboards
  • Mobile Generator Incomer as third level back up available
  • Monitoring and control marshalling cubicle with or without PLC
  • Can be supplied as a completely integrated system incorporating UPS’s and Diesel Generators – depending on line
  • Made to order – designed and engineered to meet customer requirements
  • Separate battery rooms (where specified)
  • Forced ventilation (or air-conditioning if required), with full noise attenuation
  • The range also includes individual packages of all types of equipment for installation in existing or new permanent buildings
Mains Supply Voltage 230V single phase, 400V 3 phase & 650V single phase
Traction Supply Voltage 230V to 800V single phase
Fixed Generator Supply Voltage 230V to 650V single or 3 phase
Outgoing Supplies 230V to 650V single or 3 phase
Signal Supply Protection Overload and short circuit via MCCB, fuses or electronic protection relays.Insulation monitoring.Auto – Reclose equipment can be fitted where required.
Remote Monitoring control PLC, RMU and remote digital signals as required.Local annunciator panel as required.